Subdivision #5

CovenantsPhase 5 Engineering Surveys – February 2000 August 30, 2000 Lots 501 through 546 1702-1715 E. Grand Ave.602-613 Winston Dr.1604-1718 Magnolia Dr.

Subdivision #4

CovenantsPhase 4 Engineering Surveys – June 1999 December 3, 1999 Lots 401 through 444 400-407 Winston Ct.501-601 Winston Dr.1702-1710 Catalpa Ct.1701-1710 Juniper Ct.

Subdivision #3

CovenantsPhase 3 Engineering Surveys – December 1997 October 21, 1998 Lots 301 through 340 401-407 Aspen Ct.401-408 Birch Ct.1402-1511 Locust Dr.400-508 N. Cedar Dr.

Subdivision #2

CovenantsPhase 2 Engineering Surveys – September 1996 September 10, 1997 Lots 201 through 249 1501-1507 Holzem Ct.510-610 N. Cedar Dr.1404-1511 E. Grand Ave.1403-1505 Park Ave.1602 Magnolia Dr.

Subdivision #1

Covenants Phase 1 Engineering Surveys – March 1995 October 24, 1995 Lots 101 through 143 401-613 Chestnut Dr. 1302, 1401-1403 E. Grand Ave. 1313, 1401 Park Ave.